OUR PROJECT

Umm Al Dome 

Petroser-Strukton JV

We installed the traffic signage and road marking for the completion of main upgrading works on Umm Al Dome, Al-Muaither, and Al Innabi Streets and their opening to traffic, as part of Umm Al Dome Street Improvement Project in Muaither area.

Lusail LRT

QDVC

Operations and maintenance of the work zones for Lusail LRT.

The Lusail LRT is a light rail network as part of the Lusail urban development.

Al Khor Expressway

Tekfen

Variable Message Sign (VMS) or Dynamic Message Sign (DMS) used to highlight temporary road features or convey key information to road users at Al Khor Exway.

Bike Lane Markings

Infraroad

Bike lane near East-West Corridor, which will connect all 8 stadiums built for the Qatar 2022 FIFA World Cup, as well as fan zones, residential areas, markets, tourist sites and Hamad International Airport.

West Corridor (P010)

J&P

Package 1 is part of the East-West Corridor project which is a major East-West Expressway connecting the Industrial Area to the New Doha International Airport. Package 1 comprises a 10.5 km long section that starts just west of the future Inner Orbital road at Interchange 32 and extends to just west of the proposed Barwa City Access at Interchange 29A. The main road consists of a 10-lane section (5 lanes in each direction) and four major interchanges.

Interchange IC3

Redco-Porr JV

This is a great place to tell people more about your business, and the services you offer. Want to make this content your own? It's easy. Just add your images, text and links to this preset, or connect to data from your collection.

Framework Contract

Infraroad

Road markings for traffic intersection in central Doha.

Electric Vehicle Parking

Infraroad

Road markings for traffic intersection in central Doha.

Al Gewan Island

Midmac-Porr JV

Traffic Management services for the construction of Gewan Island's entrance cable-stayed bridge. 
The 250-meter long bridge, which rests on two pylons 43 meters above The Pearl-Qatar’s Boulevard, will connect the Lusail Expressway and The Pearl-Qatar’s Boulevard to Gewan Island.

New Orbital Highway

QDVC - Bin Omran JV

The New Orbital Highway Contract 2 (NOH2) stemmed from the intention to bypass Doha City by connecting Salwa Road and North Relief Road. NOH2 consists of 10 lanes (5 in each direction) for light vehicles with additional Collectors and Distributor roads. Four separate dedicated truck lanes (2 in each direction) run parallel to the Orbital from Salwa Road to Junction 5 where a 320m long cut and cover tunnel splits away from the light vehicle carriageway towards Junction 12 Dukhan interchange.​​

Red Line North

RLR JV

TMS assisted in completing the Red Line Metro project on time for the last 5 years. 

RLR JV and TMS achieved Over a major safety milestone in the traffic management industry, having completed over 1 million hours of temporary traffic management without lost time due to injury.

New Orbital Highway

J&P

Set of rumble strips installed to warn drivers of a slowdown ahead. They are a road safety feature to alert inattentive drivers of potential danger, by causing a tactile vibration and audible rumbling transmitted through the wheels into the vehicle interior.

Bridge Inspections

WSP

Traffic Management services for infrastructure inspection on bridges along Doha.

Al Bustan South

Hyundai

Text markings as a simple yet extremely effective method of guiding motorists safely on Qatar's roads. Road markings are as important as road signs and give information about the roads being travelled on and actions that drivers should or should not be taking.

© 2021 by TMS Traffic Management Solutions. Proudly created by www.GasWorksOnline.com

  • LinkedIn
  • Instagram
  • Facebook
  • Twitter
  • YouTube